AMG & Associates is rolling full speed at the Santa Clarita The Rink Sports Pavilion project. This week the team picked up serious momentum, framing flying up, Crews carving through overhead work, and site progress cruising smoother than a freshly waxed rink floor. With every install, pour, and delivery, we’re skating closer to bringing this community a top-tier facility built the AMG way.
Here’s what we rolled out:
- Slab extension formwork is officially locked in with a smooth, solid base ready for the next lap.
- Suttles is cruising overhead, installing vent lines through the restroom zone like a perfect cross-rink pass.
- Pushed forward on fire-sprinkler laterals, keeping safety ahead of the curve.
- Jumped into exterior wall framing and kept the momentum going with mezzanine framing. The building’s starting to show its shape!
- New Air scored big with fresh duct deliveries hitting the site.
- Continued overhead electrical rough-in, wiring the rink for future action.
- And with rain on the forecast, the team knocked out rain prep to keep the jobsite dry and the schedule on track.
AMG is rolling strong, building Santa Clarita’s future go-to spot for skating, sports, and nonstop energy. Stay tuned the rink keeps getting smoother every week!