Please note:

  • Prequalification requirements differ on all projects. Please see each individual project for prequalification requirements.
  • Subcontractors are required to provide an active California State License for your scope of work.
  • Subcontractors are required to provide an active DIR Registration number for all Prevailing Wage Projects. Please review SB 854 on the State of CA website for important information related to prevailing wage compliance on public works projects.
  • Any subcontractor bids greater than $500,000 must be prepared to provide 100% Payment and Performance Bonds.
Bid # Bid Name Bid Date
3533

Technology Park – Design Build

Expand Details and Scope
Project Type
New Construction
Owner
California Polytechnic State University
Square Footage
16,250
Project Status
Bidding
Project Valuation
$10M
Prevailing Wage
Yes
Location
San Luis Obispo, CA
Scope

The project consists of a new 16,250 sf, two-story office building and associated site work.

*This is a design build project where AMG is the awarded General Contractor. 19Six has completed the 100% Construction Documents and we are looking for finalized pricing. Earthwork, Site Utilities, and Electrical have already been finalized, please do not quote those scopes. *

Prequalification is NOT required.

RFI Deadline: April 28th @ 2PM

View Plans/Specs and Other Bid Docs

05/05/2023 @ 2:00PM
3490

9/11 Memorial Park

Expand Details and Scope
Project Type
New Construction
Owner
City of Rancho Cucamonga
Square Footage
See scope
Project Status
Bidding
Project Valuation
$2M
Prevailing Wage
Yes
Location
Rancho Cucamonga, CA (San Bernardino County)
Scope

RCFPD proposes to construct a new Memorial Park to commemorate September 11th, as well as fallen service members from the Rancho Cucamonga area. The memorial park is centered around three artifacts from September 11: Steel from the World Trade Center Building, pieces of the plane from Flight 93, and a piece of the Pentagon. The artifacts have been arranged with the same spatial relationship that the three September 11 sites have to one another:

Lower Manhattan NY(WTC location), Storystown Pennsylvania (crash site of flight 93), and Arlington Virginia/Washington DC (pentagon location).  The overall scale between the physical sites has been reduced to

1/4000 for the Memorial Park. The September 11 artifacts have been linked together with a canopied walking path, and a central canopied gathering space occupying the space in between. Along the paths, in the space between the artifacts, are two Corten (laser cut) and granite block monuments. these monuments are to commemorate fallen service members from the Rancho Cucamonga area, who lost their lives in the wars in Afghanistan and the Iraq war respectively. Placed in the remaining space along the path that links the September 11 artifacts, is a planter with three flagpoles; a shaped granite pedestal with an eternal flame; and a laser cut Corten plaque. The purpose of the flagpoles, eternal flame, and plaque is to look to forward to the possibilities that the future affords.

The September 11 memorial park includes seating (granite/wood/steel benches) that flank both memorials to fallen service members, a large central gathering space for events, a picnicking area as well as an area for sensory/herb garden plantings and arboretum/gathering space education/group teaching spaces, there is also as a labyrinth/meditation garden.

Prequalification Not Required.

View Plans/Specs and Other Bid Docs

05/26/2023 @ 2PM
3585

Avenal High School CTE Building

Expand Details and Scope
Project Type
New Construction
Owner
Reef-Sunset Unified School District
Square Footage
See scope
Project Status
Bidding
Project Valuation
$8.5M
Prevailing Wage
Yes
Location
Avenal, CA
Scope

New CTE Building 19,461 sf.

Prequalification is required for MEP subs holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46, and C-51. through QualityBidders by 4/27.

View Plans/Specs and Other Bid Docs

06/01/2023 @ 2:00PM
3590

Highland High School Pool & Aquatics Center

Expand Details and Scope
Project Type
New Construction
Owner
Kern High School District
Square Footage
See scope
Project Status
Bidding
Project Valuation
$18M
Prevailing Wage
Yes
Location
Bakersfield, CA
Scope

Construction of new 50-meter plaster competition pool with covered concrete bleachers, masonry buildings housing locker rooms, classroom, restrooms, and pump house. Project also includes sports and egress lighting. Building A (restroom & locker room) is 2,448 sf, Building B (restroom, classrooms, tiered seating) is 5,426 sf, & Building C (pool storage) is 1,605 sf.

Prequalification IS required for this project.

Any contractor with a C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C46 and C-53 License(s) needs to be prequalified for this project. Prequalify through Quality Bidders by 5/16

PLEASE SEE ADDENDUM 1 FOR NEW PLANS AND SPECS

View Plans/Specs and Other Bid Docs

06/02/2023 @ 2PM
3594

Shields and Brawley Elementary School

Expand Details and Scope
Project Type
New Construction
Owner
Central Unified School District
Square Footage
61,000
Project Status
Bidding
Project Valuation
$17.5M
Prevailing Wage
Yes
Location
Fresno, CA
Scope

Construction of a new 61,000 SF elementary school campus. Bid Package 2 building and structure only.

Prequalification is required for MEP subs holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 licenses.

View Plans/Specs and Other Bid Docs

06/06/2023 @ 2:00PM
3591

Coastal Christian School New MPR & Classroom Building – PRIVATE

Expand Details and Scope
Project Type
New Construction
Owner
Coastal Christian School
Square Footage
41,481
Project Status
Bidding
Project Valuation
$20M
Prevailing Wage
No
Location
Pismo Beach, CA
Scope

Construction of a new two-story 41,481 SF multi-purpose and classroom building. Scope of site improvements include landscaping, disable access improvements, site lighting, trash enclosure, and grease trap.

Prequalification is NOT required for this project.

View Plans/Specs and Other Bid Docs

06/09/2023 @ 2PM
3593

Colton High School Culinary Arts CTE Building REBID

Expand Details and Scope
Project Type
New Construction
Owner
Colton Joint Unified School District
Square Footage
See scope
Project Status
Bidding
Project Valuation
$7M
Prevailing Wage
Yes
Location
Colton, California
Scope
  • This is a rebid. Addendum 1-8 have been incorporated into the new Plans/Specs.

INCREMENT #1: DEMOLITION OF CURRENT CAFETERIA AND CONSTRUCTION OF NEW CULINARY ARTS BUILDING.  UPGRADE HARDSCAPE AND LANDSCAPE AT ALL SIDES OF BUILDING SITE. SITE WORK AND CBC/ADA UPGRADES.

MINOR UPGRADES TO BOYS AND GIRLS RESTROOMS AT (E) MULTI-PURPOSE BUILDING (A#04-112994) ADJACENT TO SCOPE OF WORK AREA.

INCREMENT #2: MODERNIZE AND STRUCTURAL UPGRADE OF EXISTING MPR BLDG.

Prequalification IS required for this project.

Any contractor with a C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and/or C46 License(s) that intends to bid as a first-tier subcontractor to the prime contractor that is bidding directly to the district needs to be prequalified for this project

This prequalification requirement applies even if the subcontractor will perform, or is designated to perform, work that does not require one of the licenses listed above, but the subcontractor holds one of the licenses listed above.

View Plans/Specs and Other Bid Docs

06/15/2023 @ 2PM
3598

Mendota High School Modernization & Addition

Expand Details and Scope
Project Type
New Construction, Renovation
Owner
Mendota Unified School District
Square Footage
See scope
Project Status
Bidding
Project Valuation
$14M
Prevailing Wage
Yes
Location
Mendota, California
Scope

INCREMENT #1
THIS PROJECT WILL INCLUDE SOME DEMOLITION FOR THE SITE DESCRIBED ON THE CIVIL SHEETS. CONSTRUCT 1 NEW CLASSROOM BUILDING WITH FREE STANDING CANOPY WITH FIRE SPRINKLERS, 1 NEW TOILET BUILDING, INSTALL A MODULAR WEIGHT ROOM ON A CONCRETE FOUNDATION. INCLUDING ASSOCIATED SITE WORK FOR THE ENTIRE PROJECT. ALL UNDERGROUND UTILITIES ARE PART OF THIS INCREMENT.

INCREMENT #2
ADDITION TO CAFETERIA (MPR) WITH A TOILET & FIRE SPRINKLERS AND TOILET BUILDING WITH 4 HOUR WALL.

INCREMENT #3
ADDITION TO LOCKER BUILDING WITH FREE STANDING CANOPY.
FIRE ALARM IS PART OF EVERY INCREMENT.

View Plans/Specs and Other Bid Docs

06/15/2023 @ 2PM
3597

Fremont Elementary School Cafeteria Replacement

Expand Details and Scope
Project Type
New Construction
Owner
Fowler Unified School District
Square Footage
6,266
Project Status
Bidding
Project Valuation
$7M
Prevailing Wage
Yes
Location
Fowler, CA
Scope

Construction of a new 6,266 SF type VB-S1, single story cafeteria building, with commercial kitchen, rest room structure and supporting underground utilities on an existing school campus. Site work includes demolition and reconstruction of on-site and minor off-site pavements and landscaped.

Prequalification IS required for this project.

Any contractor with a C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C46 and C-53 License(s) needs to be prequalified for this project. Prequalify by 6/6

View Plans/Specs and Other Bid Docs

06/20/2023 @ 2PM
3588

Fire Station 1 Headquarters Ontario

Expand Details and Scope
Project Type
New Construction
Owner
City Of Ontario
Square Footage
27,835
Project Status
Bidding
Project Valuation
$24 M
Prevailing Wage
Yes
Location
Ontario, CA
Scope

Construction of a two story, 27,835 sq ft, type V-B construction, and associated site improvement on a 1.14 acre located within the City of ONTARIO, California.

Prequalification is NOT required for this project.

View Plans/Specs and Other Bid Docs

06/29/2023 @ 2:00PM

By submitting a bid or proposal to AMG & Associates™, subcontractor/supplier agrees that all bids and proposals that are accepted by AMG & Associates, Inc. will be subject to the the terms and conditions of AMG & Associates, Inc.’s Standard Subcontract Agreement when bidding/proposing as a subcontractor/supplier (or, at AMG & Associates election, the terms and conditions of AMG & Associates, Inc.’s Standard Purchase Order Agreement when bidding as a supplier), as well as the requirements of all project documents, including, but not limited to, the project plans, specifications, bid instructions, conditions (general and special), pre-bid addenda, and all other incorporated documents. In the event of a conflict between or among any of the project bid documents, subcontractor/supplier’s bid or proposal shall be deemed to include the more stringent requirement. Subcontractor/supplier further agrees that it is its responsibility to verify with the awarding authority the existence of all project bid documents, and that subcontractor/supplier shall not rely solely on the accuracy of the contents of the AMG & Associates Bid Center or Project tabs. It is understood and agreed by subcontractor/supplier that AMG& Associates, Inc., may, at its discretion, require 100% payment and performance bonds from subcontractor/supplier, and that the requirements for such bonds are outlined in the standard subcontract agreement.

Clamshell logo

AMG Proudly Uses Clamshell

Clamshell construction project accounting software simplifies project management for general contractors, subcontractors, and design professionals.

Scroll to Top