3490 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- City of Rancho Cucamonga
- Square Footage
- See scope
- Project Status
- Bidding
- Project Valuation
- $2M
- Prevailing Wage
- Yes
- Location
- Rancho Cucamonga, CA (San Bernardino County)
- Scope
Current drawings are at the “Design Development” stage. See scope below.
RCFPD proposes to construct a new Memorial Park to commemorate September 11th, as well as fallen service members from the Rancho Cucamonga area. The memorial park is centered around three artifacts from September 11: Steel from the World Trade Center Building, pieces of the plane from Flight 93, and a piece of the Pentagon. The artifacts have been arranged with the same spatial relationship that the three September 11 sites have to one another:
Lower Manhattan NY(WTC location), Storystown Pennsylvania (crash site of flight 93), and Arlington Virginia/Washington DC (pentagon location). The overall scale between the physical sites has been reduced to
1/4000 for the Memorial Park. The September 11 artifacts have been linked together with a canopied walking path, and a central canopied gathering space occupying the space in between. Along the paths, in the space between the artifacts, are two Corten (laser cut) and granite block monuments. these monuments are to commemorate fallen service members from the Rancho Cucamonga area, who lost their lives in the wars in Afghanistan and the Iraq war respectively. Placed in the remaining space along the path that links the September 11 artifacts, is a planter with three flagpoles; a shaped granite pedestal with an eternal flame; and a laser cut Corten plaque. The purpose of the flagpoles, eternal flame, and plaque is to look to forward to the possibilities that the future affords.
The September 11 memorial park includes seating (granite/wood/steel benches) that flank both memorials to fallen service members, a large central gathering space for events, a picnicking area as well as an area for sensory/herb garden plantings and arboretum/gathering space education/group teaching spaces, there is also as a labyrinth/meditation garden.
Prequalification Not Required.
View Plans/Specs and Other Bid Docs
|
08/16/2023 @ 2PM |
3612 |
Expand Details and Scope
- Project Type
- New Construction, Renovation
- Owner
- Tulare Joint Union High School District
- Square Footage
- See Scope
- Project Status
- Bidding
- Project Valuation
- $10M
- Prevailing Wage
- Yes
- Location
- Tulare, CA
- Scope
The project consists of 2 pools; an 18-lane competition pool (12,689 sf) and a warm-up pool (2,543 sf), on-site development work, off-site development work and an electrical and storage building (P2- 409 sf), a toilet/ shower rooms building (P3- 1,618 sf), and a pool mechanical and storage building (P4- 1,635 sf). There is 1 Add Alternate for the snack bar building (P2- 1,063 sf).
*The district has procured the Myrtha Pool, sports lighting, and scoreboard for contractor to install*
Prequalification is required for all mechanical, electrical, plumbing, fire sprinkler and sheet metal subs with the following licenses: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and C-46. Prequalify through Quality Bidders by August 17th.
View Plans/Specs and Other Bid Docs
|
08/31/2023 @ 2:00 PM |
3274 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- Alhambra Unified School District
- Square Footage
- 8,024
- Project Status
- Bidding
- Project Valuation
- $4.5M
- Prevailing Wage
- Yes, Skilled & Trained Workforce will be required for this lease-leaseback project
- Location
- San Gabriel, CA
- Scope
Please see updated plans and specs
Erect a district supplied 8,024 SF Pre-engineered metal building, complete an interior build out and associated site work.
Prequalification is required for all mechanical, electrical, plumbing, fire sprinkler and sheet metal subcontractors holding the following licenses: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46.
AMG is the awarded GC for this Lease-Leaseback project and we are requesting subcontractor bids only.
View Plans/Specs and Other Bid Docs
|
09/15/2023 @ 2:00 PM |
3615 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- Kings County Area Public Transit Agency
- Square Footage
- See scope
- Project Status
- Bidding
- Project Valuation
- $29M
- Prevailing Wage
- Yes
- Location
- Hanford, CA
- Scope
he Kings County Area Public Transit Agency is to construct a new mixed-use transit center, administrative offices, and commercial/retail. The Project will consist of the following buildings:
Building A – Two Story Office Building: Two Story building with wood framed floor and roof systems with TJI joists and glu-lam beams, plywood shear walls. Building A will be separated from Building B with a seismic joint.
Building B – Transit Center: Single Story building with a combination of wood and steel trusses supporting wood roof joists, and plywood shear walls.
Building C – Single Story Office Building: Single-story office building with wood framed gable roof with gang nail trusses, a flat roof with wood joists and glu-lam beams, and plywood shear walls.
Bus Canopy: bus shelter canopies with steel metal deck with HSS joists and beams. HSS cantilever columns will be used for the gravity and lateral system.
Prequalification is NOT required for this project.
View Plans/Specs and Other Bid Docs
|
09/28/2023 @ 2:00 PM |
3626 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- County of Ventura
- Square Footage
- See scope
- Project Status
- Bidding
- Project Valuation
- $16.3M
- Prevailing Wage
- Yes
- Location
- Camarillo, CA
- Scope
Construction of a 4.2-acre site involving development of a realistic roadway system and supporting infrastructure to accommodate fire and search & rescue training. There will be construction of a 5,431 GSF Class A Burn Building to simulate live fires in a residential setting; construction of a 12,346 GSF Class B Multi-Purpose building utilizing propane fired props to simulate training in apartment, commercial, and storefront type settings; and modifications to an existing structure to support ladder training. Construction for these buildings shall consist of conventional masonry and concrete with special mixtures designed to mitigate water infiltration and resist heat. The Class A burn building includes Multiple “Class A” Burn Rooms; Adjustable Mazes; Residential Garage Fire; Multi-Pitch Roof Ventilation; Ability to Control Light & Smoke; and Forced Entry. The Class B Building includes Center Hallways, Garden Style Apartment Circulation; Interior & Exterior Stairways; Small & Large Search & Rescue Rooms; Balconies; Forced Entry; Flat Roof; Pitched Roof; Simulated Power Poles; Curb Lines; Sprinkler System Props/Lab; Fire Alarm Simulation and Parapet Walls. The building is equipped with an integrated sound system capable of producing controlled sound effects in various spaces.
Prequalification is required for this project.
View Plans/Specs and Other Bid Docs
|
10/04/2023 @ 2:00PM |
3622 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- County of Ventura
- Square Footage
- 13,647
- Project Status
- Bidding
- Project Valuation
- $13.7M
- Prevailing Wage
- Yes
- Location
- Santa Paula, CA
- Scope
Consists of complete demolition of existing fire station in its entirety, and construction of new two-story fire station building, total 13,647 square-feet
Prequalification is not required for this project.
View Plans/Specs and Other Bid Docs
|
10/05/2023 @ 2:00 PM |
3627 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- City of Newport Beach
- Square Footage
- 9,814
- Project Status
- Bidding
- Project Valuation
- $18.5M
- Prevailing Wage
- Yes
- Location
- Newport Beach, CA
- Scope
Demo of all subservice existing utilities and site works, new site work to include new utility systems, site paving, pavement markings, signage, site walls, site lighting, trash and equipment enclosures and landscape plantings. Building construction of new 9,814 sf single story lecture hall building with courtyard and parking lot expansion.
Prequalification is NOT required for this project.
View Plans/Specs and Other Bid Docs
|
10/05/2023 @ 2:00 PM |
3610 |
Expand Details and Scope
- Project Type
- New Construction, Renovation
- Owner
- William S. Hart Union High School District
- Square Footage
- 8,749
- Project Status
- Bidding
- Project Valuation
- $10M
- Prevailing Wage
- Yes
- Location
- Canyon Country, CA
- Scope
Install a temporary kitchen. Modernization of the existing 8,749 sf Multi-Purpose Building to include site accessibility upgrades, restroom, drinking fountain & stage replacement, full seismic retrofit, interior MPR and food service reorganization including HVAC, lighting, ceiling, plumbing, fire alarm, & fire sprinkler upgrades, interior finish upgrades including flooring, ceilings & painting, exterior finishes including painting & roof replacement. Construction of a new 1,830 sf Kitchen addition to the multi-purpose building.
Prequalification is required for all mechanical, electrical, plumbing, fire sprinkler and sheet metal subcontractors holding the following licenses: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42 and C-43.
A separate Prequalification Application period will be opened in connection with this project.
View Plans/Specs and Other Bid Docs
|
10/18/2023 @ 2:00 PM |