3813 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- Chino Valley Fire District
- Square Footage
- 12,901 SF
- Project Status
- Bidding
- Project Valuation
- $16-$18M
- Prevailing Wage
- Yes
- Location
- Chino, CA
- Scope
RFI Deadline: May 21st at 2PM
Description: Construction of a new 12,901 sf single story fire station building and new 6,346 sf apparatus storage building. Includes site improvements, retaining walls, emergency generator, and trash enclosure.
Prequalification: Prequalification is NOT required
View Plans/Specs and Other Bid Docs
|
05/29/2025 @ 2:00PM |
3816 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- Porterville Unified School District
- Project Status
- Bidding
- Project Valuation
- $11.4
- Prevailing Wage
- Yes
- Location
- Porterville, CA
- Scope
The work includes but is not limited to two single-story, wood-frame classroom buildings 700 and 800, and related on-site and off-site development including a new parking lot and alterations to existing building 100 and existing parking lot.
Prequalification is required for all mechanical, electrical, plumbing, fire sprinkler and sheet metal subcontractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 licenses.
View Plans/Specs and Other Bid Docs
|
06/05/2025 @ 3:00PM |
3807 |
Expand Details and Scope
- Project Type
- Modernization, New Construction
- Owner
- Colton Joint Unified School District
- Square Footage
- 19,053 SF
- Project Status
- Bidding
- Project Valuation
- $15M
- Prevailing Wage
- Yes
- Location
- Colton, CA
- Scope
RFI Deadline: May 19th at 2PM
Description: Modernization of administration building A (6,720 sf). Construction of new locker room building R (5,501 sf). Construction of new 25 stall parking lot. Demo existing locker room building. Site improvements. Relocation of (1) 36×40 portable building N for admin interim housing from stockpile. Construction of (1) 24×40 portable building P for admin interim housing. Associated site work along path of travel. Construction of a new Pavilion Building Q (6,832 sf) and related site work.
Prequalification: Prequalification is required by May 13th for all subcontractors holding any of the following license types EVEN IF YOU WILL NOT BE PERFORMING MECHANICAL/ELECTRICAL/ PLUMBING/ FIRE SPRINKLER/ OR SHEET METAL WORK. C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46.
(Example: If you are an insulation subcontractor who also holds a C-10 license, you will need to be prequalified even if you are not performing electrical work). Use the below link to access the prequalification questionnaire https://resources.finalsite.net/images/v1727807328/coltonk12caus/jecn2jltj2ob82mjqldd/CJUSD_Prequalification_Questionnaire_2022.pdf
View Plans/Specs and Other Bid Docs
|
06/11/2025 @ 2:00PM |
3820 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- Town of Mammoth Lakes
- Square Footage
- 7,482
- Project Status
- Bidding
- Project Valuation
- $13M
- Prevailing Wage
- Yes
- Location
- Mammoth Lakes, CA
- Scope
This project includes the construction of a new 7,482 square-foot single-story (plus mezzanine) performing arts theater with supportive spaces and utilities as an addition to the existing Edison Hall building, demolition and reconstruction of existing hardscape and parking lot, and associated site work.
Prequalification is not required.
View Plans/Specs and Other Bid Docs
|
06/20/2025 @ 4:00PM |
3824 |
Expand Details and Scope
- Project Type
- New Construction
- Owner
- City of Moorpark
- Square Footage
- 17,500
- Project Status
- Bidding
- Project Valuation
- $28M
- Prevailing Wage
- Yes
- Location
- Moorpark, CA
- Scope
The New Moorpark City Library is proposed as a new 17,500 sf single story building. The project includes all associated site amenities including parking areas, pedestrian access, and landscaping. The scope of construction of the new building includes structural, mechanical, electrical, plumbing, low voltage systems, site grading, and drainage. The Moorpark City Library will be constructed in Two Phases, Phase I will consist of completing the site preparation and construction of the Library with associated utility tie-ins, hardscape and landscape. This phase is estimated to take 18 months, including site clearing, earthwork, and soils mitigation. Phase II will consist of the demolition of the existing Library and West Parking lot and removal of the existing utilities, relocation of a gas line, site clearing, and site preparation and completion of construction of the new parking lot. This phase is estimated to take 6 months.
Prequalification is not required for subcontractors.
View Plans/Specs and Other Bid Docs
|
07/01/2025 @ 2:00PM |
3829 |
Expand Details and Scope
- Project Type
- Renovation
- Owner
- County of Fresno
- Project Status
- Bidding
- Project Valuation
- $3.1M
- Prevailing Wage
- Yes
- Location
- Fresno, CA
- Scope
The work to be done consists, in general, of improvements to Kearney Park, located at 6725 W. Kearney Blvd. in Fresno, CA, including the installation of a new County-furnished prefabricated restroom and connecting it to utilities, demolishing two septic tanks at existing restrooms and connecting those restrooms to an existing City of Fresno sewer trunk, removing the old playground and installing three new County-furnished playground structures, installing a County-furnished premanufactured steel shelter, constructing a multi-purpose court (tennis, basketball and pickleball courts), reconstructing a parking lot, installing additional lighting throughout the park, and other miscellaneous work such as clearing and grubbing, grading, parking lot striping, installation of speed bumps and wheel stops. Additive items include fog sealing some of the existing parking lots and the replacement/repair of existing decorative rock walls throughout the park.
Prequalification: Not required
View Plans/Specs and Other Bid Docs
|
07/02/2025 @ 2:00PM |
3817 |
Expand Details and Scope
- Project Type
- New Construction, Renovation
- Owner
- City of Inglewood
- Square Footage
- 70,000+/-
- Project Status
- Bidding
- Project Valuation
- $45M
- Prevailing Wage
- Yes
- Location
- Inglewood, CA
- Scope
The approximately 70,000 sq. ft. Library was constructed in 1973 and is four stories in height with a rooftop equipment penthouse. This renovation scope shall comprise upgrades to: – The building’s structure including seismic upgrades – Mechanical, electrical, plumbing, lighting, technology, and other systems – Interior partitions – Ceilings – Millwork, furniture, finishes, and equipment – Signage, wayfinding graphics and building identification signage Additionally, the scope shall include improvements to: – The surrounding site including fenced trash and delivery areas, ramps and steps to meet adjacent existing grades City of Inglewood. Second level Exterior Plaza – Vertical circulation including stairs and elevators – Accessibility – Fire / life safety – Selected areas of the building envelope -Parking lot improvements including accessible parking and path of travel, asphalt pavement rehabilitation, curb repairs, redesign of vehicle circulation and parking lot within the property, parking lot signing and striping upgrades, additional parking lot lighting on the west side parking lot and curb ramp and curb extension installation on the east side of the property.
- Prequalification is not required for subcontractors
View Plans/Specs and Other Bid Docs
|
07/10/2025 @ 10:00 AM |
3718 |
Expand Details and Scope
- Project Type
- New Construction, Renovation
- Owner
- Kern County
- Square Footage
- See docs
- Project Status
- Bidding
- Project Valuation
- $7M
- Prevailing Wage
- Yes
- Location
- Lamont, CA
- Scope
This project consist, in general, of removing existing baseball field and placing a soccer field with goals, construction of splash pad, skate park, recreation structure with multi-courts, placement of exercise equipment with shade sails, inclusive play equipment with shade sails, enclosed multi-courts with LED lighting, restrooms and drinking fountains, outdoor pavilion with raised stage and canopy, resurface and expansion of basketball courts, covered family picnic shelter, barbeque grills and picnic tables throughout, accessible walking path expansion, landscape, trees, irrigation and controls upgrades, sprinkler modifications, grading, parking and sidewalk modifications, and signage.
View Plans/Specs and Other Bid Docs
|
07/22/2025 @ 11:00AM |