Bid Number
3615
Owner
Kings County Area Public Transit Agency
Bids Due
10/12/2023 @ 2:00 PM
Estimator
David Silva
Project Type
New Construction
Square Footage
See scope
Project Status
Bidding
Project Valuation
$29M
Prevailing Wage
Yes
Location
Hanford, CA
Public/Private
Public

Scope of Work

he Kings County Area Public Transit Agency is to construct a new mixed-use transit center, administrative offices, and commercial/retail. The Project will consist of the following buildings:

Building A – Two Story Office Building: Two Story building with wood framed floor and roof systems with TJI joists and glu-lam beams, plywood shear walls. Building A will be separated from Building B with a seismic joint.

Building B – Transit Center: Single Story building with a combination of wood and steel trusses supporting wood roof joists, and plywood shear walls.

Building C – Single Story Office Building: Single-story office building with wood framed gable roof with gang nail trusses, a flat roof with wood joists and glu-lam beams, and plywood shear walls.

Bus Canopy: bus shelter canopies with steel metal deck with HSS joists and beams. HSS cantilever columns will be used for the gravity and lateral system.

Prequalification is NOT required for this project.

Send Bids

Please send proposals at least 60 minutes prior to bid delivery. Proposals may be sent by either email or FAX.

All bids must contain the following information:

  • CLSB Number
  • DIR Number
  • Business Address
  • Business Phone Number
  • Please include DVBE, SBE, or DBE certification # if applicable

Thank you for bidding with AMG

By submitting a bid or proposal to AMG & Associates™, subcontractor/supplier agrees that all bids and proposals that are accepted by AMG & Associates, Inc. will be subject to the the terms and conditions of AMG & Associates, Inc.’s Standard Subcontract Agreement when bidding/proposing as a subcontractor/supplier (or, at AMG & Associates election, the terms and conditions of AMG & Associates, Inc.’s Standard Purchase Order Agreement when bidding as a supplier), as well as the requirements of all project documents, including, but not limited to, the project plans, specifications, bid instructions, conditions (general and special), pre-bid addenda, and all other incorporated documents. In the event of a conflict between or among any of the project bid documents, subcontractor/supplier’s bid or proposal shall be deemed to include the more stringent requirement. Subcontractor/supplier further agrees that it is its responsibility to verify with the awarding authority the existence of all project bid documents, and that subcontractor/supplier shall not rely solely on the accuracy of the contents of the AMG & Associates Bid Center or Project tabs. It is understood and agreed by subcontractor/supplier that AMG& Associates, Inc., may, at its discretion, require 100% payment and performance bonds from subcontractor/supplier, and that the requirements for such bonds are outlined in the standard subcontract agreement.

Clamshell logo

AMG Proudly Uses Clamshell

Clamshell construction project accounting software simplifies project management for general contractors, subcontractors, and design professionals.

Scroll to Top